Below is a super clean and dramatic glass backsplash. Looks really striking against the dark cabinets. I had a lot of fun doing this one.




Here you can catch a glimpse of my custom soap dish. I make these out of field tile and face it off with a bullnose. If you've ever had problems finding one of those pre-made soap dishes because they never quite match the rest of your tile, you'll appreciate this technique.
Custom insert box or niche. This whole job started here. I wanted to get this lined up perfect. This took a lot of planning because you have to frame these boxes out with 2x4s in between the studs, then cover the framing with cement board, then water proof that and hope your measurements were accurate. If not, it takes a lot to take all that apart to re-frame it. I got lucky here. Or maybe I'm just good!
Here is a shot of the main bathroom floor. I decided to do a diamond pattern to contrast the rectangles on the walls. Took more time, but was well worth it.
This a tile foyer that I installed months before the shower. It is actually the same tile that is in the shower, just different sizes and colors.
Wasn't sure how to address the diamond pattern with the closet, so I decided to just do the "brick" pattern in the closet to allow the diamond pattern to appear to be framed by a single darker tile. When the door is closed, it just looks like a dark brown frame. When you look inside, you see a charming brick layout.
In this shot, you can see the miter cuts that were needed allow the rail tile to meet the floor. Also, here you can see the tedious triangle shaped tiles that were custom cut to fit each space after the stairs were installed.
In this shot, I hope you can see more of the miter cuts for the rail tiles to reach the floor. These rail tile were odd shaped. They were square on one corner and about a 30 degree slant on the opposite corner. So trying to marry these pieces together was a great lesson for me in tile installation!
There were large pieces of travertine that were set on cement beds. I framed in each bed and packed in Portland cement and sand mix just like I would do in a custom shower floor. After the bed is cured, I remove the wood frames, waterproof the mud bed, and set the travertine tile on top.



